Showing 1 - 5 of 5
This paper focuses on inconsistencies arising from the use of NPV and CAPM for capital budgeting. It shows that (i) CAPM capital budgeting decision-making based on disequilibrium NPV is deductively inferred by the Capital Asset Pricing Model, (ii) the use of the disequilibrium NPV is widespread...
Persistent link: https://www.econbiz.de/10005836868
This paper presents a new way of measuring residual income, originally introduced by Magni (2000a, 2000b, 2003). Contrary to the standard residual income, the capital charge is equal to the capital lost by investors. The lost capital may be viewed as (a) the foregone capital, (b) the capital...
Persistent link: https://www.econbiz.de/10005789544
This paper shows that (i) project valuation via disequilibrium NPV+CAPM contradicts valuation via arbitrage pricing, (ii) standard CAPM-minded decision makers may fail to profit from arbitrage opportunities, (iii) standard CAPM-based valuation violates value additivity. As a consequence, the...
Persistent link: https://www.econbiz.de/10005260104
This paper deals with the use of the CAPM for capital budgeting purposes. Four different measures are deductively drawn from this model: the disequilibrium Net Present Value, the equilibrium Net Present Value, the disequilibrium Net Future Value, the equilibrium Net Future Value. While all of...
Persistent link: https://www.econbiz.de/10005055505
In capital budgeting, the internal rate of return (IRR) criterion and the net present value (NPV) criterion are considered incompatible in several cases. A longstanding debate developed in past years about the reliability of either method is still an issue of investigation (see, for example,...
Persistent link: https://www.econbiz.de/10005621745