Showing 1 - 8 of 8
A supplier provides several lead-time options to its customers in a periodic review inventory system. The replenishment lead time is a multiple of the inventory review cycle. Customers are classified into two groups: short lead-time customers requiring the product immediately and long lead-time...
Persistent link: https://www.econbiz.de/10014210616
We consider the problem of scheduling n jobs in a pallet-constrained two-machine flowshop so as to minimize the makespan. In such a flowshop environment, each job needs a pallet the entire time, from the start of its first operation until the completion of the last operation, and the number of...
Persistent link: https://www.econbiz.de/10014211244
A heuristic procedure is developed for minimizing makespan in flow-shop scheduling problems. In comparison with current algorithms, our algorithm seems to result in an improved makespan with a small additional computational effort. An algorithm is also developed to minimize the required number...
Persistent link: https://www.econbiz.de/10012746785
We consider the scheduling problem of cyclic production in a bufferless dual-gripper robot cell processing a family of identical parts. The objective is to find an optimal sequence of robot moves so as to maximize the long-run average throughput rate of the cell. While there has been a...
Persistent link: https://www.econbiz.de/10012750229
We propose a model where customers are classified into two groups: short lead-time customers who require the product immediately and long lead-time customers to whom the supplier may deliver either immediately or in the next cycle. Unmet orders are backlogged with associated costs. Specifically,...
Persistent link: https://www.econbiz.de/10012838119
Flow shop scheduling is common in modern lean production systems. In practice, jobs in flow shops can arrive at irregular times. However, scheduling that considers such irregularity has not been adequately investigated in the literature. In this paper, we examine the scheduling of n-jobs in an...
Persistent link: https://www.econbiz.de/10012838801
We study the problem of scheduling a chain-reentrant shop, in which each job goes for its processing first to a machine called the primary machine, then to a number of other machines in a fixed sequence, and finally back to the primary machine for its last operation. The problem is to schedule...
Persistent link: https://www.econbiz.de/10014218590
We establish the computational complexity of the problem of minimizing makespan in a flowshop, where each jobs requires a pallet the entire time, from the start of its first operation until the completion of the last operation. We prove that the problem is NP-hard in the strong sense for m =2...
Persistent link: https://www.econbiz.de/10013152472