Showing 1 - 10 of 32
We consider the problem of scheduling n jobs in a pallet-constrained two-machine flowshop so as to minimize the makespan. In such a flowshop environment, each job needs a pallet the entire time, from the start of its first operation until the completion of the last operation, and the number of...
Persistent link: https://www.econbiz.de/10014211244
A single-machine multiproduct manufacturing system with random breakdowns and random repair times is considered. Under a weak capacity condition on the system it is shown that the total work-in-progress (WIP) is a recurrent stochastic process. By replacing the stochastic model by a deterministic...
Persistent link: https://www.econbiz.de/10012746440
In this paper, we consider a production planning problem in a two-machine flowshop subject to breakdown and repair of machines and subject to non-negativity constraints on work-in-process. The machine capacities and demand processes are assumed to be finite state Markov chains. The problem is to...
Persistent link: https://www.econbiz.de/10012746441
This note formulates an assignment problem for obtaining optimal level schedules for mixed-model assembly lines in JIT production systems. The problem was formulated as a quadratic integer programming problem in a recent paper by Miltenburg (1989) where, however, only enumerative algorithms and...
Persistent link: https://www.econbiz.de/10012746783
A heuristic procedure is developed for minimizing makespan in flow-shop scheduling problems. In comparison with current algorithms, our algorithm seems to result in an improved makespan with a small additional computational effort. An algorithm is also developed to minimize the required number...
Persistent link: https://www.econbiz.de/10012746785
A companion paper (Part I) considers the problem of minimizing the weighted earliness and tardiness of jobs scheduled on a single machine around a common due date, d, which is unrestrictively late. This paper (Part II) considers the problem of minimizing the unweighted earliness and tardiness of...
Persistent link: https://www.econbiz.de/10012746786
A single machine processing different types of parts is considered. Switching from one type to another involves a setup time. The part types may have different processing times. The resulting scheduling problem is treated as a dynamical system for which several feedback policies that are...
Persistent link: https://www.econbiz.de/10012746791
We consider the scheduling problem of cyclic production in a bufferless dual-gripper robot cell processing a family of identical parts. The objective is to find an optimal sequence of robot moves so as to maximize the long-run average throughput rate of the cell. While there has been a...
Persistent link: https://www.econbiz.de/10012750229
Parallel machine structure is very common in modern production systems. Its performance sometimes has a decisive impact on the whole productivity. In this paper, we consider a parallel-machine scheduling problem where each machine is subject to periodic maintenance. Instead of assuming all the...
Persistent link: https://www.econbiz.de/10012838273
Job shop scheduling with a bank of machines in parallel is important from both theoretical and practical points of review. Here we focus on a flexible job shop scheduling problem of minimizing the makespan in a two-center job shop, where the first center consists of one machine and the second...
Persistent link: https://www.econbiz.de/10012838656