Showing 1 - 10 of 11
that risk-based performance standards are met. Trade-offs in schedule, volumes of waste lots, and allowable concentrations …
Persistent link: https://www.econbiz.de/10009435454
without costly upgrades. Of course these gains must be achieved without impacting operational performance. Downsizing is also … a context-dependent model that provides a capability to anticipate impending failures and determine machine performance … over a protracted period of time. This prognostic capability links operational requirements to an economic performance …
Persistent link: https://www.econbiz.de/10009435565
review of the specific technology cost and performance assumptions they made, primarily for wind power. We then turn to the …
Persistent link: https://www.econbiz.de/10009435648
manufacturers have stimulated innovations and improved the performance of existing technologies. With this resurgence, Sandia …
Persistent link: https://www.econbiz.de/10009435722
improved capability and performance rather than vendor lock-in. Some of these standards appear to be gaining traction in the …
Persistent link: https://www.econbiz.de/10009436198
technology cost and performance assumptions they made, primarily for wind power. We then turn to the utilities' analysis of …
Persistent link: https://www.econbiz.de/10009436215
) Financial Performance Milestones not met--for FY-08 there are fixed, base and stretch financial performance milestones for the …
Persistent link: https://www.econbiz.de/10009436230
a performance- based decision-aiding tool to provide an analytical basis for planning, prioritizing, and selecting … Environmental Protection Agency (EPA) long-term performance regulations. SPM calculates the probabilities of certain sets of …
Persistent link: https://www.econbiz.de/10009436613
the analysis it routinely conducts in compliance with the Government Performance and Results Act (GPRA) and for strategic …
Persistent link: https://www.econbiz.de/10009436634
Fiscal Year 1998 represents the second full year utilizing a results-oriented, performance-based contract. This … document describes the critical outcomes, objectives, performance indicators, expected levels of performance, and the basis for … the evaluation of the Contractors performance for the period October 1, 1997 through September 30, 1998, as required by …
Persistent link: https://www.econbiz.de/10009436682