Determination of economic production quantity for a multi-stage production system with limited storage capacity
Year of publication: |
2003
|
---|---|
Authors: | Buscher, Udo ; Lindner, G. |
Published in: |
Operations research proceedings 2002 : selected papers of the International Conference on Operations Research (SOR 2002) ; Klagenfurt, September 2 - 5, 2002 ; with 51 tables. - Berlin : Springer, ISBN 3-540-00387-8. - 2003, p. 89-94
|
Subject: | Mehrstufige Produktion | Multistage production | Produktionsplanung | Production planning | Losgröße | Lot size | Lagermanagement | Warehouse management | Mathematische Optimierung | Mathematical programming | Theorie | Theory |
-
Models and Lagrangian heuristics for a two-level lot-sizing problem with bounded inventory
Brahimi, Nadjib, (2015)
-
Al-Salamah, Muhammad, (2019)
-
Optimal run time for EPQ model with scrap, rework and stochastic breakdowns : a note
Chiu, Yuan-shyi Peter, (2014)
- More ...
-
Lotsizing in a production system with rework and product deterioration
Inderfurth, Karl, (2003)
-
Lot sizing in a production system with rework and product deterioration
Inderfurth, K., (2005)
-
Buscher, U., (2004)
- More ...