NEW COMPUTATIONAL RESULTS FOR THE DISCRETE TIME/COST TRADE-OFF PROBLEM WITH TIME-SWITCH CONSTRAINTS
Year of publication: |
2003-06
|
---|---|
Authors: | VANHOUCKE, M. |
Institutions: | Faculteit Economie en Bedrijfskunde, Universiteit Gent |
Subject: | Project Management | CPM | Time/cost trade-off problem | Time-switch constraints |
-
Dynamic project scheduling with reduction of activity durations
Fujiwara, Toshihisa, (2016)
-
Moments and distribution of the NPV of a project
Creemers, S., (2016)
-
Activity modes selection for project crashing through deterministic simulation
Mohanty, Ashok, (2011)
- More ...
-
SELS, V., (2011)
-
SELS, V., (2011)
-
An Artificial Immune System based approach for solving the Nurse Re-rostering Problem
MAENHOUT, B., (2011)
- More ...